Today we had a toilet rail system installed in the downstairs toilet. Woo hoo! This is something I have been trying to get done since Mom fell on July 13. After searching the Internet and spending tons of time on the phone trying to locate a suppliers I called our plumber. They had it ordered and installed within the week.
The toilet rail does make the toilet rather regal and, well, throne like. I am somewhat tempted to place a crown on the back of the tank. The rails works great- and importantly- can be flipped up to minimize little boy pee on the cross bar.
We had our first physical therapy appointment yesterday to evaluate Mom and set goals. Her bad knee is actually at an 18 degree angle now to her thigh and is totally unstable. The therapist knew immediately which side Mom fell on, not because of any lingering bruising, but because the instability of the joint leaves her with little right sided leg support. It hurts to look at her try to stand and balance on that knee. As a result of the knee problems and her osteoporosis she has developed curves in her spine and back pain.
The goals for therapy will be to give her safe ways of maneuvering despite the instability of her knee. We will work on improving her practical skills like getting in and out of the car, up an down stairs and on and off chairs. It is going to be a tough workout for Mom. The therapist is extremely kind and Mom is very fond of her, which should help.
Thursday, August 9, 2007
Subscribe to:
Post Comments (Atom)
1 comment:
Congratulations on the toilet rail! I'm also glad that your Mom likes the new therapist.
Post a Comment